IATF 16949 certified aluminum casting facility
Home/Certifications
Quality Assurance

Certifications &
Quality Systems

IATF 16949:2016 certified aluminum casting manufacturer (NQA, valid through Nov 2027). ISO 9001 quality requirements integrated. PPAP Level 3 or Level 4 support when required, with in-house CMM, X-ray, and spectrometer testing.

Quick answer for buyers

Bohua Cast supports OEM aluminum casting RFQs with IATF 16949:2016 quality-system evidence, PPAP Level 3 or Level 4 documentation when required by the program, in-house dimensional and X-ray inspection planning, and third-party testing coordination when specified. Certificate proof is available for qualified RFQ review; ISO 14001 is described as application in progress where currently uncertified.

Buyer facts

Quality systemIATF 16949:2016 — issued 21 Nov 2024 by NQA, valid through 20 Nov 2027
IATF USICRMYCX (verify in the official IATF database)
ISO 9001Scope integrated within IATF 16949 audit
ISO 14001Application in progress (not yet certified)
PPAP supportLevel 3 / Level 4 per AIAG when required by the RFQ, launch plan, or customer-specific requirement
In-house inspectionHexagon CMM, X-ray, OES spectrometer, helium leak, tensile, metallographic microscope
Third-party labsSGS, TÜV Rheinland, Intertek, Bureau Veritas can be coordinated when independent reports are specified

Buyer verification path

Use certification evidence to qualify the RFQ path, not as a brochure check

Buyers searching for aluminum foundry quality certifications usually need proof that a supplier can support real drawing-based work. For Bohua, start with IATF 16949 scope, PPAP level, CMM and X-ray availability, leak-test method, traceability, and third-party report options before sending the RFQ package.

Our Certifications

Verified Quality,
Documented Standards

IATF 16949:2016 certificate issued by NQA (National Quality Assurance, UK)
Active

IATF 16949:2016

Bohua holds an active IATF 16949:2016 certification, the automotive quality management standard used by many OEM and Tier 1 supplier-approval teams.

Issued by:
NQA (National Quality Assurance, UK)
Validity:
Issued 21 Nov 2024 · Valid through 20 Nov 2027
Scope:
Manufacturing of aluminum alloy cast parts
IATF USI:
CRMYCXVerify ↗
Integrated in IATF 16949

ISO 9001:2015

Status: Quality requirements integrated within IATF 16949
Timeline: Maintained alongside IATF 16949 certification

Quality management system — IATF 16949 incorporates the full ISO 9001:2015 requirements with additional automotive-specific provisions.

Under Application

ISO 14001:2015

Status: Application in progress
Timeline: Application submitted · audit scheduled 2026

Environmental management system

🏆

IATF 16949:2016 Certified

The automotive industry's most rigorous quality management standard

What IATF 16949 Certification Means for You

IATF 16949 is the global quality management system standard for automotive suppliers. Developed by the International Automotive Task Force (IATF) in collaboration with ISO, it integrates ISO 9001 requirements with automotive-specific demands for defect prevention, supply chain management, and continuous improvement.

Our IATF 16949:2016 certification is issued by NQA (National Quality Assurance, UK), with a current validity period from 21 November 2024 through 20 November 2027. It supports defect-prevention discipline, robust process control, and traceability — requirements that automotive OEMs and Tier 1 suppliers demand from their casting partners. Buyers can verify our certification status using IATF USI CRMYCX in the official IATF database.

Key Benefits of Working with an IATF 16949 Certified Foundry:

  • Defect Prevention: APQP, FMEA, and control plans reduce the risk of quality issues reaching production
  • Traceability Records: Raw material heat/lot, process, inspection, and shipment records maintained; part-level serial tracking can be defined by program scope
  • PPAP Capability: Documentation packages per agreed AIAG/customer scope, such as PSW, dimensional reports, material certs, and capability studies
  • Continuous Improvement: Internal audits, management review, and corrective action systems ensure ongoing quality enhancement
  • Supplier Confidence: IATF certification is widely recognized across automotive supply chains; customer-specific approval or audit steps may still apply.

Testing & Inspection

In-House Inspection
Equipment

Modern testing and inspection equipment for dimensional accuracy, material verification, non-destructive testing, and mechanical property validation.

Dimensional Inspection

Hexagon CMM (Coordinate Measuring Machine)

Model: Global S 7.10.7Accuracy: ±(2.5+L/300) µm

Mitutoyo Height Gauge

Model: HDS-3020Accuracy: ±0.01 mm

Mitutoyo Caliper & Micrometer Set

Profile Projector

Model: CPJ-3015Mag: 10×–100×

Material Analysis

Oxford Foundry Master Pro Spectrometer

Real-time alloy composition analysis for all 28 elements in aluminum alloys

Metallurgical Microscope

Model: Olympus GX51

Microstructure analysis, grain size measurement

Brinell Hardness Tester

Model: HBE-3000A

Hardness testing per ASTM E10

Non-Destructive Testing (NDT)

X-Ray Digital Radiography System

Model: Y.MU2000-D

X-ray inspection support for defined porosity checks, critical features, or RFQ sampling plans; 0.3 mm resolution

Helium Leak Detector

Model: ASM 340

Leak testing for pressure-tight components, sensitivity 5×10⁻¹¹ mbar·L/s

Dye Penetrant Testing (PT) Station

Surface crack detection per ASTM E1417

Mechanical Testing

Universal Testing Machine (UTM)

Model: WDW-100ECapacity: 100 kN

Tensile, compression, bending tests per ASTM B557

Impact Testing Machine

Model: JB-300B

Charpy impact testing per ASTM E23

Fatigue Testing Machine

High-cycle fatigue testing

Surface & Environmental Testing

Surface Roughness Tester

Model: SJ-210Accuracy: Ra 0.01 µm

Salt Spray Test Chamber

Model: YWX-750

Corrosion resistance testing per ASTM B117

Coating Thickness Gauge

Model: CM-8856

Anodizing/powder coating thickness measurement

Automotive Compliance

PPAP Documentation
Capability

Production Part Approval Process (PPAP) documentation per AIAG (Automotive Industry Action Group) standards. We support PPAP Level 3 and Level 4 submissions when required by automotive customers or program launch plans.

PPAP Level 3

Standard automotive industry requirement. We provide:

Part Submission Warrant (PSW)
Dimensional inspection report (full layout)
Material test results (chemical composition, mechanical properties)
Initial process studies (capability studies for critical characteristics)
Measurement system analysis (MSA/GR&R)
Appearance approval report (AAR) if required
Sample production parts (minimum 300 pieces from production tooling)
Master sample
Checking aids (fixtures, gauges if applicable)
Customer-specific requirements documentation

PPAP Level 4

For higher-risk or safety-critical parts. Includes Level 3 plus:

Complete material and performance test results
Qualification test results (environmental, durability, fatigue)
Process FMEA (Failure Mode and Effects Analysis)
Control plan
Process flow diagram

Quality Management

End-to-End Quality
Control Processes

📦

Incoming Material Control

Spectrometer verification of aluminum ingot alloy composition per incoming material control plan. Certificates of analysis (CoA) from suppliers archived. Raw material traceability by heat/lot number.

📊

In-Process Inspection

Statistical Process Control (SPC) for key casting parameters: pouring temperature, cooling time, mold temperature. Real-time monitoring via process-control systems. Automatic alerts for out-of-spec conditions.

🔍

Final Inspection & Testing

Dimensional inspection of critical features per control plan or RFQ requirement. X-ray inspection for defined pressure-critical scope. Leak testing for pump/valve housings when specified. CMM inspection per sampling plan. Traceability records from raw material heat/lot through finished-part shipment.

📈

Continuous Improvement

Monthly internal audits per IATF requirements. Root cause analysis (8D methodology) for any non-conformances. Corrective/preventive action (CAPA) system tracked in ERP. Annual management review of quality metrics.

Independent Verification

Third-Party Testing Partners

We can coordinate with globally recognized testing laboratories when independent material verification, certification, or compliance testing is specified in the RFQ.

SGS
Material testing, dimensional inspection, chemical analysis
TÜV Rheinland
Product certification, safety testing, environmental compliance
Intertek
Material verification, mechanical property testing, failure analysis
Bureau Veritas
Supply chain audits, quality system verification

FAQ

Buyer questions about certifications and documentation

What aluminum foundry quality certifications should buyers verify before RFQ?

Buyers should verify the current IATF 16949 certificate, the certified manufacturing scope, ISO 9001 integration, PPAP capability, inspection equipment, traceability records, and whether the supplier can provide third-party test reports for the part category being quoted.

Is Bohua Casting IATF 16949 certified?

Yes. Bohua Casting is IATF 16949:2016 certified by NQA (National Quality Assurance, UK), issued 21 November 2024 and valid through 20 November 2027. The certified scope is: Manufacturing of aluminum alloy cast parts. Our IATF USI (Unique Site Identifier) is CRMYCX, which can be verified at iatfglobaloversight.org.

What other quality certifications does Bohua hold?

ISO 9001:2015 quality management requirements are fully incorporated within our IATF 16949:2016 certification — IATF 16949 is built on ISO 9001 with additional automotive-specific provisions, so a single IATF audit covers both. ISO 14001:2015 (environmental management system) is currently under application with audit scheduled in 2026.

Can you provide PPAP documentation?

Yes. We support PPAP (Production Part Approval Process) documentation at Level 3 or Level 4 when required by the automotive customer or launch plan. Typical packages may include PSW, dimensional inspection reports, material test results, process capability studies, MSA/GR&R, and sample production parts. Final document scope follows the RFQ, drawing, and customer-specific requirements.

What inspection equipment do you have in-house?

Our in-house inspection capabilities include: Hexagon CMM (±2.5 µm accuracy), Oxford Foundry Master spectrometer, X-ray digital radiography system (0.3 mm resolution), helium leak detector, universal testing machine (100 kN), surface roughness tester, and metallurgical microscope. Dimensional, X-ray, leak-test, and CMM scope should be defined in the control plan or RFQ requirements.

Do you work with third-party testing labs?

Yes. When independent evidence is required, we can coordinate with recognized third-party laboratories such as SGS, TÜV Rheinland, Intertek, or Bureau Veritas for material testing, dimensional inspection, chemical analysis, or certification-related services. Report scope, timing, and cost should be agreed during RFQ review.

What is your quality system traceability?

Traceability records are maintained from raw material heat/lot number through production, inspection, and shipment records. Part-level serial marking or unique identifiers can be planned when required by the drawing, control plan, or customer-specific requirement.

Need Quality Documentation?

Request copies of our certification documents, relevant inspection equipment calibration records, or PPAP examples aligned with your project scope. Our quality team reviews document requests with the RFQ scope and buyer qualification requirements.